Natural History Museum Hintze Hall Refurbishment, London
Project Overview
Client:
Natural History Museum
Project Name:
Hintze Hall Refurbishment and Re-Presentation
Form of Contract:
JCT Standard Form of Building Contract 2011
Project Value:
£5.5 million
Location:
London
Services Provided:
Quantity Surveying
Baker Mallett were appointed to provide cost consultancy services and CDM Services for the refurbishment and re-presentation of the Hintze Hall at the Natural History Museum.
The project comprised the refurbishment to ground, first and second floor display areas, including replacement of the roof lights above what is the main focal point of the Museum.
The project included, conservation work to the terracotta wall linings and features, and restoration work to mosaic flooring. We also facilitated in the installation of the Blue Whale by providing the support bracketry from which it was suspended.